Rajasthan Atomic Power Project 鈥� Units 3 & 4 (2x220 Mwe) & Units 7 & 8 (2x700 Mwe)
Rajasthan Atomic Power Project
For Units 3 & 4, we constructed the Natural Draft Cooling Towers (NDCT) on a EPC basis while for Units 7 & 8, we managed the common service piping and the 400 / 220 kV Switchyard on an EPC basis.